How to use 1.6 Ton x 20M wire rope pulling hoist

There are 3 steps to operate 1.6 Ton x 20M wire rope pulling hoist

  1. Rope crossing.

Hold the machine in one hand, push C, after hearing a noise click, the grip jaws open and the clean wire rope can e reeved to a desired length. Then push C downward by hand to allow grip jaws to clamp the rope. When pulling the forward handle back and forward, the rope inlet or outlet shows that the unit worked normally.

2. Anchoring.

Fixed axis is to be used to anchor the rope around it. The other tip of the rope is tied to load. After the fixed axis is inserted into the machine case, it must be turned twice. Start operation until the second tunnel is obstructed. Let the rope tip expose above the fixed axis, so as to ensure the rope to travel smoothly.

3.Operating.

To lift a load or push a load forward or tension it: Push the forward handle.

To lower a load or pull a load forward: Pull the the backward handle.

To stop working: Not to pull the handle will stop the load at arbitrary position, whether lifting or lowering it.

Note: please operate the machine according to the working capacity. The safety pin would be cut off when overload, please replace the safety pin after confirmation and continue to work.

 It’s easy and simple to operate 1.6 Ton x 20M wire rope pulling hoist, Hangzhou Carlstahl Imp & Exp Co., Ltd. supply high grade alumium pulling hoist.if you have other questions, pls send email: [email protected].